Instrumentation: Difference between revisions

From Bondline
Az gila (talk | contribs)
No edit summary
Az gila (talk | contribs)
No edit summary
Line 1: Line 1:
DRAFT NEW PAGE  - ''Gil Alexander''
DRAFT NEW PAGE  - ''Gil Alexander''
NEEDS A&P SIGN-OFF - and 337 filed for STC.
Installation of Mitchell Instrument STC gauge package.


Items needed but not supplied...
 
== NEEDS A&P SIGN-OFF - and 337 filed for STC. ==
 
 
== Installation of Mitchell Instrument STC gauge package. ==
 
 
 
== Items needed but not supplied... ==
 


1. #8 ring terminals with 1/4 inch hole (instructions say to just use existing wiring, but my plane - 77 Tiger - used 3/16 terminals on the power wiring to the old ammeter)
1. #8 ring terminals with 1/4 inch hole (instructions say to just use existing wiring, but my plane - 77 Tiger - used 3/16 terminals on the power wiring to the old ammeter)
Line 22: Line 29:
== Wiring the gauges ==
== Wiring the gauges ==


The guages need quite a bit of work wiring before any installation.  Since each guage is a separate module, all of the common wiring (power, grounds, lighting) need to be connected together.  This is how I did it....
The guages need quite a bit of work wiring before any installation.  Since each guage is a separate module, all of the common wiring (power, grounds, lighting) need to be connected together.  This is how I did it.... top of module is on the left.
[[Image:Mitchell-gauge-wiring-A.JPG]]
[[Image:Mitchell-gauge-wiring-A.JPG]]

Revision as of 05:38, 21 February 2006

DRAFT NEW PAGE - Gil Alexander


NEEDS A&P SIGN-OFF - and 337 filed for STC.

Installation of Mitchell Instrument STC gauge package.

Items needed but not supplied...

1. #8 ring terminals with 1/4 inch hole (instructions say to just use existing wiring, but my plane - 77 Tiger - used 3/16 terminals on the power wiring to the old ammeter)

2. New hoses to senders - I used new AN-4 firesleeved hoses - 10.5 inches for fuel pressure and 18 inches for oil pressure - but 16 inch would probably be better - see later pics.

3. Clamps to mount the senders, 5/8 for the engine mount side and 1 9/16 for the senders. Instructions call for all clamps to be cushioned MS21919, however the oil pressure sender does not have a ground connection, and cushioned clamps do a good job of electrical isolation. Since my supply house did not have 1 9/19 plain clamps, I found that a 1 7/16 cushioned clamp with the rubber removed worked well. The AN3 bolt that is used to connect the small and large clamps can be used for a ground point.

3. Usual assortment of #20 aircraft wire and good quality ring terminals and splices.

4. You need to connect 3 or 4 wires into a single wire in four places, I found that soldering and a good quality heat shrink worked well. Check with your A&P on this and do what he/she prefers.

5. AN929-4D caps (2)- to seal off the old fittings that penetrated the firewall.

6. AN910-4D couplings (2) and AN816-4D (2) pipe thread to flare fitting to connect the sensors to the hoses.


Wiring the gauges

The guages need quite a bit of work wiring before any installation. Since each guage is a separate module, all of the common wiring (power, grounds, lighting) need to be connected together. This is how I did it.... top of module is on the left.