Instrumentation: Difference between revisions
No edit summary |
|||
| Line 19: | Line 19: | ||
4. You need to splice 3 or 4 wires into a single wire in four places, I found that soldering and a good quality heat shrink worked well. Check with your A&P on this and do what he/she prefers. | 4. You need to splice 3 or 4 wires into a single wire in four places, I found that soldering and a good quality heat shrink worked well. Check with your A&P on this and do what he/she prefers. | ||
5. | 5. Rubber "booties" to protect the exposed hot wires (when the Master is ON) on the ammeter shunt - not essential, but a nice safety feature to have - [http://www.aircraftspruce.com/catalog/elpages/termnips.php MS25171-1] (2). | ||
6. AN910-4D couplings (2) and AN816-4D (2) pipe thread to flare fitting to connect the sensors to the hoses. | 6. AN929-4D caps (2)- to seal off the old fittings that penetrated the firewall. | ||
7. AN910-4D couplings (2) and AN816-4D (2) pipe thread to flare fitting to connect the sensors to the hoses. | |||
== Wiring the gauges == | == Wiring the gauges == | ||
Revision as of 19:05, 21 February 2006
DRAFT NEW PAGE - Gil Alexander
Installation of Mitchell Instrument STC gauge package.
NEEDS A&P SIGN-OFF - and 337 filed for STC.
Items needed but not supplied...
1. #8 wire gauge ring terminals with 1/4 inch hole (instructions say to just use existing wiring, but my plane - 77 Tiger - used 3/16 terminals on the power wiring to the old ammeter, and the new shunt has 1/4 inch threaded terminals)
2. New hoses to senders - I used new AN-4 firesleeved hoses - 10.5 inches for fuel pressure and 18 inches for oil pressure - but 16 inch would probably be better - see later pics.
3. Clamps to mount the senders, 5/8 for the engine mount side and 1 9/16 for the two senders. Instructions call for all clamps to be cushioned MS21919, however the oil pressure sender does not have a ground connection, and cushioned clamps do a good job of electrical isolation. Since my supply house did not have 1 9/16 plain clamps, I found that a 1 7/16 cushioned clamp with the rubber removed worked well. The AN3 bolt that is used to connect the small and large clamps can be used as a ground point for this sensor.
3. Usual assortment of #20 aircraft wire and good quality ring terminals and splices.
4. You need to splice 3 or 4 wires into a single wire in four places, I found that soldering and a good quality heat shrink worked well. Check with your A&P on this and do what he/she prefers.
5. Rubber "booties" to protect the exposed hot wires (when the Master is ON) on the ammeter shunt - not essential, but a nice safety feature to have - MS25171-1 (2).
6. AN929-4D caps (2)- to seal off the old fittings that penetrated the firewall.
7. AN910-4D couplings (2) and AN816-4D (2) pipe thread to flare fitting to connect the sensors to the hoses.
Wiring the gauges
The gauges need quite a bit of work wiring before any installation occurs. Since each gauge is a separate module, all of the common wiring (power, grounds, lighting) need to be connected together. This is how I did it.... top of module is on the left.
<still in progress...>
